Meralco meter base installation guide North Grenville

Meralco meter base installation guide

Section 5 Meters and Service Entrance Equipment Energy UK: Guidance for electricity & gas meter installation consumer facing issues Page 1 of 57 Guidance for Electricity and Gas Meter Installation Consumer Facing Issues A guide for meter operatives on how to act and actions to take when identifying consumer facing issues May 2015 Energy UK Version: v 1.0 Status: Final published

How to Install Meter Base Wiring eHow

METER INSPECTION PROCEDURE Energy Regulatory Commission. Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company., Installation Manual Three Phase Energy Meter For HXE310 CT & CTPT Meter Hexing Electrical Co., Ltd. www.hxgroup.cn [2013.3].

* Applications with more than 5KW of applied load need to be computed and formalized by a Meralco representative. Please note that the bill deposit amount may be adjusted yearly to reflect the close average monthly bill of the customer. The adjustment mechanism is covered by Meralco’s Annual Update of Bill Deposit (AUBD) program. Unless otherwise specified you need a 5/8th inch by 8 foot copper clad rod. A great trick is to drive it in at a 45 degree angle and bend it up as you go so it ends up straight after it drive in

Meter base can be used with services where the main breaker is rated at 225, 250 or 300 amps, or with no more than two breaker panels whose combined main breaker rating does not exceed 400 amps. On all underground installations the bottom of the meter base must remain clear to allow for EMCEMC conductors to be installed. Who would be interested in the pictures of electric meters? I do not know either. However, electric meters are an important component in electrical installations. That is how the energy consumed by an installation is measured and recorded. With this record, the owner of a factory, as an example, can be charged for what he uses.

11/08/2014 · Learn the steps on how to apply for an electrical connection. Subscribe to Philippine Realty TV YouTube Channel - http://bit.ly/PhilRealtyTV Visit our websit... MERALCO AGENCY – Proceed to MERALCO AGENCY @ LV2 Move In Office – Bahay Kubo. 4. SUBMIT – Submit required documents. 5. EVALUATION – Meralco will evaluate and approve immediately if docs are okey. 6. PAY – When approve, pay application fee Php 3,250.00. 7. TIME – 45 days. Author's page Lancaster Cavite. Lancaster Cavite offers affordable houses for sale in Lancaster New City, a

Eaton is your one-stop shop for the widest range of residential and light commercial electric meter sockets in the industry. These single-socket surface- or flush-mount outdoor enclosures come in two styles, allowing for both easy, cost-saving installation, and for the use of BR- or CH-type branch breakers. The one-piece, die-run electric meter socket enclosures eliminate tampering and extend In certain situations wherein the customer has a temporary service connection, there will be an installation and removal cost for the temporary electric facility structure. 5. Meralco installs meter and/or additional facilities and energizes your electric service.

OH: Meters EMWP Pole-Mounted Primary Metering Installation, (12 or 21 kV Line) 058779 Page 2 of 8 Rev. #03: 07в€’01в€’14 11. Placement of the PTs and CTs on the cluster bracket can be interchanged to suit the job application. HOW TO INSTALL A 200 AMP ELECTRICAL SERVICE This will describe the most common type of electrical service installation, the back-to-back where the service panel is located on the inside wall directly behind the meter base and is serviced by overhead lines. The connection between the meter base and the panel is made through a pipe nipple and is

Meter Base Guide. Do you need to have your meter base repaired? Need to install a new meter base? Has the city or the electricity provider notified you that your meter base needs to be repaired or upgraded? Nisat Electric can help! Many people are confused about the meter base and the electrical service panel. The meter base is the enclosure A service entrance houses your electric meter, and must follow Meralco technical and safety standards to ensure the safety of your home or business. You can have our certified contractors or electricians do this (click h ere for more information), or refer to your private contractor/electrician Just make sure that it complies with our standards to avoid repeating the process.

Eaton is your one-stop shop for the widest range of residential and light commercial electric meter sockets in the industry. These single-socket surface- or flush-mount outdoor enclosures come in two styles, allowing for both easy, cost-saving installation, and for the use of BR- or CH-type branch breakers. The one-piece, die-run electric meter socket enclosures eliminate tampering and extend 11/08/2014В В· Learn the steps on how to apply for an electrical connection. Subscribe to Philippine Realty TV YouTube Channel - http://bit.ly/PhilRealtyTV Visit our websit...

All meter and service equipment installations shall comply with the service requirements of CRA-ES and with rules and regulations of the inspection authorities having jurisdiction. All meter sockets and enclosures shall be listed and approved by a recognized testing lab. If any question arises for which you cannot find the answer in the following pages, it is suggested that you call CRA-ES for CT’s, or current transformers, and PT’s, or potential transformers are used in metering to step down current and voltage to safer and more manageable levels. Many people want to know what is a current transformer and potential transformer. Here I will try to demystify the CT PT confusion. One thing… Continue reading

HIGH RISE METERING & MULTI-FLOOR INFRASTRUCTURE REQUIREMENTS A High Rise building is defined as a building larger than three stories. Meter rooms located inside shall be approved by NES Meter Department during the design phase, or A service entrance houses your electric meter, and must follow Meralco technical and safety standards to ensure the safety of your home or business. You can have our certified contractors or electricians do this (click h ere for more information), or refer to your private contractor/electrician Just make sure that it complies with our standards to avoid repeating the process.

* Applications with more than 5KW of applied load need to be computed and formalized by a Meralco representative. Please note that the bill deposit amount may be adjusted yearly to reflect the close average monthly bill of the customer. The adjustment mechanism is covered by Meralco’s Annual Update of Bill Deposit (AUBD) program. Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company.

Service Equipment Guide DTE Energy

Meralco meter base installation guide

Meter Base Specifications Electrical District No 2. Thanks for staying connected. Get the latest news and service advisories from Meralco. Help us improve our service. Submit Feedback, 11/08/2014В В· Learn the steps on how to apply for an electrical connection. Subscribe to Philippine Realty TV YouTube Channel - http://bit.ly/PhilRealtyTV Visit our websit....

MERALCO Connection Procedure Lancaster Cavite

Meralco meter base installation guide

Service Application Types Meralco. REQUIREMENTS Net Metering Zero Export; DEFINITION: A program under the Renewable Energy Act carried out by the Energy Regulatory Commission (ERC)that allows customers who install RE facility within their premises with a capacity of up to 100kW, to export excess electricity to the distribution utility, i.e. Meralco. Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company..

Meralco meter base installation guide

  • How do you install a ground rod to a house meter base
  • Fees for a New Electric Service Meralco
  • How do you install a ground rod to a house meter base

  • ION8650 meter installation guide Overview The PowerLogicв„ў ION8650 advanced power and energy revenue meter features comprehensive logging, advanced power quality measurement, multi-protocol and multi-port communications, including IRIG-B support, and … Unless otherwise specified you need a 5/8th inch by 8 foot copper clad rod. A great trick is to drive it in at a 45 degree angle and bend it up as you go so it ends up straight after it drive in

    OH: Meters EMWP Pole-Mounted Primary Metering Installation, (12 or 21 kV Line) 058779 Page 2 of 8 Rev. #03: 07в€’01в€’14 11. Placement of the PTs and CTs on the cluster bracket can be interchanged to suit the job application. HIGH RISE METERING & MULTI-FLOOR INFRASTRUCTURE REQUIREMENTS A High Rise building is defined as a building larger than three stories. Meter rooms located inside shall be approved by NES Meter Department during the design phase, or

    Eaton is your one-stop shop for the widest range of residential and light commercial electric meter sockets in the industry. These single-socket surface- or flush-mount outdoor enclosures come in two styles, allowing for both easy, cost-saving installation, and for the use of BR- or CH-type branch breakers. The one-piece, die-run electric meter socket enclosures eliminate tampering and extend Thank you for your interest in instituting good governance practice in Meralco . If you are aware of any violation of the following corporate governance rules, committed by any our directors, officers or employees, related to the following:

    * Applications with more than 5KW of applied load need to be computed and formalized by a Meralco representative. Please note that the bill deposit amount may be adjusted yearly to reflect the close average monthly bill of the customer. The adjustment mechanism is covered by Meralco’s Annual Update of Bill Deposit (AUBD) program. Meter Base Guide. Do you need to have your meter base repaired? Need to install a new meter base? Has the city or the electricity provider notified you that your meter base needs to be repaired or upgraded? Nisat Electric can help! Many people are confused about the meter base and the electrical service panel. The meter base is the enclosure

    Thank you for your interest in instituting good governance practice in Meralco . If you are aware of any violation of the following corporate governance rules, committed by any our directors, officers or employees, related to the following: HIGH RISE METERING & MULTI-FLOOR INFRASTRUCTURE REQUIREMENTS A High Rise building is defined as a building larger than three stories. Meter rooms located inside shall be approved by NES Meter Department during the design phase, or

    2. The District must approve all meter locations prior to installation. (WAC 296-46B-230). 3. Where multiple meter bases serving the same address or where confusion could exist which meter serves what, such as apartment houses, commercial businesses, solar generation and other situations all meter bases shall be permanently labeled as Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company.

    A service entrance houses your electric meter, and must follow Meralco technical and safety standards to ensure the safety of your home or business. You can have our certified contractors or electricians do this (click h ere for more information), or refer to your private contractor/electrician Just make sure that it complies with our standards to avoid repeating the process. 2. The District must approve all meter locations prior to installation. (WAC 296-46B-230). 3. Where multiple meter bases serving the same address or where confusion could exist which meter serves what, such as apartment houses, commercial businesses, solar generation and other situations all meter bases shall be permanently labeled as

    CT’s, or current transformers, and PT’s, or potential transformers are used in metering to step down current and voltage to safer and more manageable levels. Many people want to know what is a current transformer and potential transformer. Here I will try to demystify the CT PT confusion. One thing… Continue reading Meter Base Installation Guides. 100 AMP / 200 AMP Overhead Service Installation (Hollywood Riser / Weatherhead Setup) 60 AMP Overhead Temporary Construction Service Installation 100 AMP Mobile Home Overhead Meter Pole Installation. 200 AMP Overhead Meter Pole Installation. Underground - H Structure Service Installation . 100 AMP / 200 AMP Underground Service Installation (On House) 400 …

    Installation Manual Three Phase Energy Meter For HXE310 CT & CTPT Meter Hexing Electrical Co., Ltd. www.hxgroup.cn [2013.3] ION8650 meter installation guide Overview The PowerLogic™ ION8650 advanced power and energy revenue meter features comprehensive logging, advanced power quality measurement, multi-protocol and multi-port communications, including IRIG-B support, and …

    Nondisclosure agreement is referred different ways, like confidentiality agreement, confidentiality disclosure agreement, proprietary agreement and secrecy agreement templates.It is a legal agreement that is signed between minimum two parties to define private information or material to be shared with one another for business purposes but it has to be restricted for further use or dissemination. Confidentiality and nondisclosure agreement pdf Windsor CONSULTANT CONFIDENTIALITY AND NON-DISCLOSURE AGREEMENT _____ This Confidentiality and Non-Disclosure Agreement (“Agreement”) is made . BETWEEN: Common Ground Mediation & Consulting (the “Consultant”) AND: Name of the Client (the “Client”) WHEREAS, the Consultant has been engaged in the performance of work for the Client under Contract #

    Net Metering Meralco

    Meralco meter base installation guide

    How to Apply for Meralco Meter and Requirements Guide. Who would be interested in the pictures of electric meters? I do not know either. However, electric meters are an important component in electrical installations. That is how the energy consumed by an installation is measured and recorded. With this record, the owner of a factory, as an example, can be charged for what he uses., Thank you for your interest in instituting good governance practice in Meralco . If you are aware of any violation of the following corporate governance rules, committed by any our directors, officers or employees, related to the following:.

    Electrical Design Standards Meralco

    Installation Manual Three Phase Energy Meter. Almost all of the Utility Companies will expect you to install the meter base, while you are wiring your structure, yet these Utility Companies will most commonly retain control of these meter bases once they energize your dwelling service by applying their seal to that meter base. After the seal is installed to protect the “their cash, When you enroll in Net Metering, Meralco will replace your current meter and install a bi-directional meter in your home. The bi-directional meter measures both the electricity you get from the company (i.e. Import Energy) as well as the excess electricity produced by your solar installation that is exported back to it (i.e. Export Energy)..

    When you enroll in Net Metering, Meralco will replace your current meter and install a bi-directional meter in your home. The bi-directional meter measures both the electricity you get from the company (i.e. Import Energy) as well as the excess electricity produced by your solar installation that is exported back to it (i.e. Export Energy). Your Getting Connected Guide “Ensuring you get the best possible service is our number one priority. Please call our Connections Team if you have any questions.” Basil Scarsella Chief Executive Officer UK Power Networks “Ensuring you get the best possible service is our number one priority. Please call our Connections Team if you have any questions.” Basil Scarsella Chief Executive

    How to Apply for Meralco Meter and Requirements Random 43 Comments If you have a new house or a house that still doesn’t have an electric meter from Meralco, chances are you wondering what are the requirements or qualification to get one. Who would be interested in the pictures of electric meters? I do not know either. However, electric meters are an important component in electrical installations. That is how the energy consumed by an installation is measured and recorded. With this record, the owner of a factory, as an example, can be charged for what he uses.

    OH: Meters EMWP Pole-Mounted Primary Metering Installation, (12 or 21 kV Line) 058779 Page 2 of 8 Rev. #03: 07в€’01в€’14 11. Placement of the PTs and CTs on the cluster bracket can be interchanged to suit the job application. the trench bring the power tothe conduit at the base of the service entrance. Underground Service, Flush-Mount Meter . Figure 3-5. Underground service to a flush-mount meter. Figure 3-5 shows a finished underground installation with the meter mounted flush with the surface of the building. Flush-mount meters are sometimes in- stalled for aesthetic reasons. The service is underground from the

    When you enroll in Net Metering, Meralco will replace your current meter and install a bi-directional meter in your home. The bi-directional meter measures both the electricity you get from the company (i.e. Import Energy) as well as the excess electricity produced by your solar installation that is exported back to it (i.e. Export Energy). 11/08/2014В В· Learn the steps on how to apply for an electrical connection. Subscribe to Philippine Realty TV YouTube Channel - http://bit.ly/PhilRealtyTV Visit our websit...

    Almost all of the Utility Companies will expect you to install the meter base, while you are wiring your structure, yet these Utility Companies will most commonly retain control of these meter bases once they energize your dwelling service by applying their seal to that meter base. After the seal is installed to protect the “their cash Your Getting Connected Guide “Ensuring you get the best possible service is our number one priority. Please call our Connections Team if you have any questions.” Basil Scarsella Chief Executive Officer UK Power Networks “Ensuring you get the best possible service is our number one priority. Please call our Connections Team if you have any questions.” Basil Scarsella Chief Executive

    Almost all of the Utility Companies will expect you to install the meter base, while you are wiring your structure, yet these Utility Companies will most commonly retain control of these meter bases once they energize your dwelling service by applying their seal to that meter base. After the seal is installed to protect the “their cash Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company.

    OH: Meters EMWP Pole-Mounted Primary Metering Installation, (12 or 21 kV Line) 058779 Page 2 of 8 Rev. #03: 07в€’01в€’14 11. Placement of the PTs and CTs on the cluster bracket can be interchanged to suit the job application. REQUIREMENTS Net Metering Zero Export; DEFINITION: A program under the Renewable Energy Act carried out by the Energy Regulatory Commission (ERC)that allows customers who install RE facility within their premises with a capacity of up to 100kW, to export excess electricity to the distribution utility, i.e. Meralco.

    2. The District must approve all meter locations prior to installation. (WAC 296-46B-230). 3. Where multiple meter bases serving the same address or where confusion could exist which meter serves what, such as apartment houses, commercial businesses, solar generation and other situations all meter bases shall be permanently labeled as 11/08/2014В В· Learn the steps on how to apply for an electrical connection. Subscribe to Philippine Realty TV YouTube Channel - http://bit.ly/PhilRealtyTV Visit our websit...

    Thanks for staying connected. Get the latest news and service advisories from Meralco. Help us improve our service. Submit Feedback Project-Covered Application (PCA) – involves the installation of additional Meralco facilities, such as poles, transformers, and lines, to provide the customer power requirements. This involves a design of facilities process, which both Meralco and customer should agree before starting with the construction.

    In certain situations wherein the customer has a temporary service connection, there will be an installation and removal cost for the temporary electric facility structure. 5. Meralco installs meter and/or additional facilities and energizes your electric service. This stage includes an inspection of the Service Entrance depending on the meter set-up (2 uni-directional meter or single bi-directional meter). A Certificate of Final Electrical Inspection (CFEI), to be obtained from the city or municipality, may be required on a case-to-case basis.

    Fees for a New Electric Service Meralco. Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company., Wiring a meter base is the responsibility of a homeowner. Some utility companies may supply the meter base and some will not. In most cases, only the service drop and meter are installed by the utility company. The meter socket, wiring and all the fittings are the responsibility of the owner as well..

    Service Equipment Guide DTE Energy

    Meralco meter base installation guide

    ION8650 meter installation guide ION8650. REMEMBER: Ensure that you use the correct materials and that the construction follows the Meralco standard. 7.Call the branch or the Meralco Call Center after you have installed the meter socket, and give your Service Application Number. Shortly after your call, the Branch will send a Field Representative to check your service entrance., When you enroll in Net Metering, Meralco will replace your current meter and install a bi-directional meter in your home. The bi-directional meter measures both the electricity you get from the company (i.e. Import Energy) as well as the excess electricity produced by your solar installation that is exported back to it (i.e. Export Energy)..

    How to Apply for Meralco Meter and Requirements Guide. "Meter" - a device for measuring the electric power and energy supplied to a customer. 22. "Meter Enclosure" - a wood or metal cabinet, or metal socket, installed indoors or outdoors, in which the Company's metering equipment is located. 23. "Meter Sockets" - a meter socket is the base portion of a socket type meter. There, HIGH RISE METERING & MULTI-FLOOR INFRASTRUCTURE REQUIREMENTS A High Rise building is defined as a building larger than three stories. Meter rooms located inside shall be approved by NES Meter Department during the design phase, or.

    meralco.com.ph Main navigation (Mobile SM XS)

    Meralco meter base installation guide

    Electrical Design Standards Meralco. Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company. Who would be interested in the pictures of electric meters? I do not know either. However, electric meters are an important component in electrical installations. That is how the energy consumed by an installation is measured and recorded. With this record, the owner of a factory, as an example, can be charged for what he uses..

    Meralco meter base installation guide


    • Check installation, and install tamper seals and secure electronic settings that may alter the accuracy and integrity of the meter and associated devices. • Record initial flow meter reading at time of installation. • Record all measurement and configuration data used in flow computer and make this information available for future use. CT’s, or current transformers, and PT’s, or potential transformers are used in metering to step down current and voltage to safer and more manageable levels. Many people want to know what is a current transformer and potential transformer. Here I will try to demystify the CT PT confusion. One thing… Continue reading

    ION8650 meter installation guide Overview The PowerLogic™ ION8650 advanced power and energy revenue meter features comprehensive logging, advanced power quality measurement, multi-protocol and multi-port communications, including IRIG-B support, and … Almost all of the Utility Companies will expect you to install the meter base, while you are wiring your structure, yet these Utility Companies will most commonly retain control of these meter bases once they energize your dwelling service by applying their seal to that meter base. After the seal is installed to protect the “their cash

    Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company. HOW TO INSTALL A 200 AMP ELECTRICAL SERVICE This will describe the most common type of electrical service installation, the back-to-back where the service panel is located on the inside wall directly behind the meter base and is serviced by overhead lines. The connection between the meter base and the panel is made through a pipe nipple and is

    MERALCO AGENCY – Proceed to MERALCO AGENCY @ LV2 Move In Office – Bahay Kubo. 4. SUBMIT – Submit required documents. 5. EVALUATION – Meralco will evaluate and approve immediately if docs are okey. 6. PAY – When approve, pay application fee Php 3,250.00. 7. TIME – 45 days. Author's page Lancaster Cavite. Lancaster Cavite offers affordable houses for sale in Lancaster New City, a Eaton is your one-stop shop for the widest range of residential and light commercial electric meter sockets in the industry. These single-socket surface- or flush-mount outdoor enclosures come in two styles, allowing for both easy, cost-saving installation, and for the use of BR- or CH-type branch breakers. The one-piece, die-run electric meter socket enclosures eliminate tampering and extend

    Who would be interested in the pictures of electric meters? I do not know either. However, electric meters are an important component in electrical installations. That is how the energy consumed by an installation is measured and recorded. With this record, the owner of a factory, as an example, can be charged for what he uses. Almost all of the Utility Companies will expect you to install the meter base, while you are wiring your structure, yet these Utility Companies will most commonly retain control of these meter bases once they energize your dwelling service by applying their seal to that meter base. After the seal is installed to protect the “their cash

    Project-Covered Application (PCA) – involves the installation of additional Meralco facilities, such as poles, transformers, and lines, to provide the customer power requirements. This involves a design of facilities process, which both Meralco and customer should agree before starting with the construction. Eaton is your one-stop shop for the widest range of residential and light commercial electric meter sockets in the industry. These single-socket surface- or flush-mount outdoor enclosures come in two styles, allowing for both easy, cost-saving installation, and for the use of BR- or CH-type branch breakers. The one-piece, die-run electric meter socket enclosures eliminate tampering and extend

    A meter socket houses the electricity for the meter for your home and can also be known as a meter base. The meter itself is provided by your utility company and used to calculate your monthly bills. Individual states may have slightly different legislation about requirements for the meter socket the trench bring the power tothe conduit at the base of the service entrance. Underground Service, Flush-Mount Meter . Figure 3-5. Underground service to a flush-mount meter. Figure 3-5 shows a finished underground installation with the meter mounted flush with the surface of the building. Flush-mount meters are sometimes in- stalled for aesthetic reasons. The service is underground from the

    Meralco can help you monitor your solar installation through Net-Metering, a program under RA 9513, the Renewable Energy (RE) Act that allows customers to install an RE facility within their premises up to a capacity of 100kW. Any excess electricity not consumed in the home or business is exported to a distribution utility (in this case Eaton is your one-stop shop for the widest range of residential and light commercial electric meter sockets in the industry. These single-socket surface- or flush-mount outdoor enclosures come in two styles, allowing for both easy, cost-saving installation, and for the use of BR- or CH-type branch breakers. The one-piece, die-run electric meter socket enclosures eliminate tampering and extend

    ION8650 meter installation guide Overview The PowerLogic™ ION8650 advanced power and energy revenue meter features comprehensive logging, advanced power quality measurement, multi-protocol and multi-port communications, including IRIG-B support, and … When you enroll in Net Metering, Meralco will replace your current meter and install a bi-directional meter in your home. The bi-directional meter measures both the electricity you get from the company (i.e. Import Energy) as well as the excess electricity produced by your solar installation that is exported back to it (i.e. Export Energy).

    • Check installation, and install tamper seals and secure electronic settings that may alter the accuracy and integrity of the meter and associated devices. • Record initial flow meter reading at time of installation. • Record all measurement and configuration data used in flow computer and make this information available for future use. A service entrance houses your electric meter, and must follow Meralco technical and safety standards to ensure the safety of your home or business. You can have our certified contractors or electricians do this (click h ere for more information), or refer to your private contractor/electrician Just make sure that it complies with our standards to avoid repeating the process.

    Unless otherwise specified you need a 5/8th inch by 8 foot copper clad rod. A great trick is to drive it in at a 45 degree angle and bend it up as you go so it ends up straight after it drive in Unless otherwise specified you need a 5/8th inch by 8 foot copper clad rod. A great trick is to drive it in at a 45 degree angle and bend it up as you go so it ends up straight after it drive in